📡 IncentivesRadar
Programs › California

Net Billing Tariff (NBT) — commercial customer generation export compensation

activeCaliforniastatetariff/exportSolar PVBattery storage (ESS)CHP / cogeneration
ValueExport credits at CPUC Avoided Cost Calculator values (well below retail import rates); 2025/2026 interconnection vintages use the 2025 ACC per secondary sources
DeadlinesOngoing tariff; effective since 4/15/2023 (D.22-12-056); no deadline
RequirementsNon-residential customers take service on designated electrification TOU rates (e.g., E-ELEC PG&E, TOU-D-PRIME SCE); interconnection fee $94-145; system sized up to annual load plus 50%; monthly billing
CaveatsAvoided-cost export values make pure export economics weak — pair with storage for TOU arbitrage; NBT evaluation ordered by D.23-11-068 could change terms; legacy NEM 1.0/2.0 systems keep old terms for 20-yr tariff life
Last verified2026-07-26

You found one program. The radar watches all 111 — matched to your exact sites, with alerts before application windows close.

Sign in →

Related programs

See every program your facilities qualify for

This page is one program out of 111 on the radar. Signed-in users get the whole picture, matched to their own sites:

Request access / sign inSee how it works →