📡 IncentivesRadar
Programs › Florida

FPL Net Metering (Rule 25-6.065) with COG-1 As-Available Excess Energy Credit

activeFloridautilitytariff/exportSolar PVCHP / cogenerationBattery storage (ESS)
ValuekWh credits for excess generation; year-end surplus cashed out on December bill at COG-1 as-available (avoided-cost) rate; Tier 3 covers >100 kW to 2 MW AC
Deadlinesongoing tariff; no application cycle
Requirementscustomer-owned renewable generation up to 2 MW AC for net metering tiers; Tier 3 needs application fee and >=$2M liability insurance; >=50 kW needs three-phase service and manual disconnect
Caveatsno monetary payment during year, credits only; systems >2 MW fall outside net metering and must sell as QF under COG tariffs (Section 10 of FPL tariff book); minimum/base/demand charges still apply
Last verified2026-08-12

You found one program. The radar watches all 111 — matched to your exact sites, with alerts before application windows close.

Sign in →

Related programs

See every program your facilities qualify for

This page is one program out of 111 on the radar. Signed-in users get the whole picture, matched to their own sites:

Request access / sign inSee how it works →