ValueCapital grants covering up to (but not including) 50% of eligible commercialisation and construction costs for new low-carbon heat networks (incl. cooling) and retrofit/expansion of existing networks; commercialisation support capped at £1M; drawdown available to FY2029-30
DeadlinesRound 12 closed 9/25/2026; Round 13 not announced as of 10/30/2026 (fund allocated through FY2027-28; drawdown to FY2029-30)
RequirementsPublic, private or third-sector organisation in England or Wales (no sole traders); detailed project documentation with application; heat network must meet low-carbon requirements
CaveatsEngland and Wales only; competitive rounds — later rounds expected but not guaranteed and Round 13 unannounced (gov.uk page last updated 6/10/2026); industrial waste-heat export into a heat network is an eligible use case; check with Triple Point ([email protected]) for next-round timing Last verified2026-10-30